Full construction of bathroom in a basement.
Saniflow waste system installed installed.
All new lighting, plumbing and tiling.
08/2024
07/2024
12/02/24
Bathroom, stripped out, window changed, all new fistures and fittings. Ceramic tiles. Nice uncomplicated bathroom.
Two bathrooms renovated. Sean the house owner had recently purchased the property.
Small bathroom totally renovated. Bath moved, all new bathroom furniture and fittings installed, ceiling replastered, tiling and painted and decorated.
1000x1200 quadrant shower installed, all walls and ceiling replastered, bath repositioned, sink repositioned, floor, shower enclosure and splashbacks tiled. Left to be painted by customer.
Bathroom stripped back to bare walls,
Ceramic tiles with white grout on walls
All new bathroom furniture
coving was reapplied where the walls were tiled
©Copyright. All rights reserved.
We need your consent to load the translations
We use a third-party service to translate the website content that may collect data about your activity. Please review the details in the privacy policy and accept the service to view the translations.